- Contact Person : Mr. guo vincent
- Company Name : Zhengzhou Han Fa Imp&Exp Trading Co., Ltd.
- Tel : 86-371-67990397
- Fax : 86-371-67990387
- Address : Henan,Zhengzhou,Rm 1509, Block B, 7 Dongqing Street, High and New Tech Zone
- Country/Region : China
- Zip : 450000
drilling equipments HF-3 with high quality
drilling equipments HF-3 with high quality
Drilling depth | m | 300-600 | |||||
Open hole caliber | mm | 300 | |||||
End hole caliber | mm | 75 | |||||
Drilling rod | mm | Φ60 | |||||
Drilling angle | 90°-65° | ||||||
Spindle | |||||||
Spindle forward speed | r/min | 57-1024 | |||||
Spindle reverse speed | r/min | 45-212 | |||||
Spindle stroke | mm | 560 | |||||
Spindle inner diameter | mm | 96 | |||||
Spindle lifting capacity | KG | 6000 | |||||
Hoist | |||||||
Single line lifting speed | m/s | 0.515 0.894 1.421 1.948 | |||||
Hug floodgate belt width | mm | 90 | |||||
Tightrope caliber | mm | 12.5 or 14 | |||||
Hoist single line lifting capacity | KG | 3000 | |||||
Reel caliber | mm | 200 | |||||
Reel cubic measure | m | 30 | |||||
Mud Pump | |||||||
Horizontal double actuator | |||||||
Displacement | L/min | 200,125 | |||||
Triangle conveyer belt type | B×5 | ||||||
Work pressure | Mpa | 4.6 | |||||
Water inlet caliber | mm | 65 | |||||
Water to exit caliber | mm | 37 | |||||
Oil Pump | |||||||
Duplex gear oil pump F532/F314 | |||||||
Front displacement,pressure | 32L/min 20Mpa | ||||||
Behind displacement,pressure | 14L/min 20Mpa | ||||||
Drilling Rig Power | |||||||
Diesel engine | HP | 395Kz 41HP | |||||
Electric motor | KW | Y180L-4 30KW |
drilling equipments HF-3 with high quality